ENGINEERING THE FOUNDATIONS OF TOMORROWDiscuss your next project ↗

JS Series Double-Shaft Forced Concrete Mixer

JS Series Double-Shaft Forced Concrete Mixer

Equipment visualization · final configuration follows the technical schedule.

Concrete Mixers

JS Series Double-Shaft Forced Concrete Mixer

A twin-shaft forced-mixing family for stand-alone mixing duties and concrete batching-plant installations.

Twin-shaft mixersProject configuration
Request product details ↗← Back to Concrete Mixers
TECHNICAL DATA / TWIN-SHAFT MIXERS

Specifications & configuration

A twin-shaft forced-mixing family for stand-alone mixing duties and concrete batching-plant installations.

SeriesJS twin-shaft forced mixers
Reference model rangeJS500, JS750, JS1000, JS1500, JS2000, JS3000
Reference discharge-volume range500–3,000 L
JS Series Double-Shaft Forced Concrete Mixer — technical specification and equipment configuration
ParameterSpecificationParameterSpecification
SeriesJS twin-shaft forced mixersInstallation optionsStand-alone mixer or batching-plant main mixer
Reference model rangeJS500, JS750, JS1000, JS1500, JS2000, JS3000Working componentsMixing shafts, blades and chamber liners
Reference discharge-volume range500–3,000 LFeed arrangementBatch ingredient loading
Reference charging-volume range800–4,800 LDischarge arrangementControlled batch discharge
Mixing actionOpposed twin-shaft forced mixingApplication scopeRoads, bridges, precast and ready-mix production
01

Purposeful mixing action

The mixer moves materials through a defined blending pattern to combine aggregate, binder and liquids.

02

Wear-component access

Blades, liners and other working surfaces are the main focus of routine condition checks.

03

Line compatibility

Feeding, water supply and discharge interfaces connect the mixer to the surrounding production equipment.

Operating process

  1. Introduce the measured batch ingredients.
  2. Run the mixer through the specified mixing cycle.
  3. Discharge the mixture to the receiving system.
  4. Clean the mixing chamber and inspect the working surfaces.

Typical applications

  • Concrete batching and production lines
  • Precast and component manufacturing
  • Building and infrastructure works
Discuss this equipment ↗

Published reference configuration. Output depends on the material, operating cycle and site conditions. Final supply follows the agreed technical schedule.