ENGINEERING THE FOUNDATIONS OF TOMORROWDiscuss your next project ↗
ZEANMACHINE / GUIDE

Stationary or mobile?

Selecting a concrete batching configuration

Z

01 / PLANNING GUIDE

Start with the site

A fixed production location and a project that moves between sites call for different planning. Consider the available footprint, foundation scope, access routes and expected relocation schedule.

02 / PLANNING GUIDE

Plan material flow

Map aggregate storage, cement delivery, mixer discharge and vehicle circulation. A plant layout should be considered alongside the whole site operation.

03 / PLANNING GUIDE

Define the comparison

Compare configurations using the same materials, production targets and included handling steps. Confirm final technical figures with the supplier.

Prepare your enquiry ↗