ENGINEERING THE FOUNDATIONS OF TOMORROWDiscuss your next project ↗

JS3000 Double-Shaft Forced Concrete Mixer

JS3000 Double-Shaft Forced Concrete Mixer

Equipment visualization · final configuration follows the technical schedule.

Concrete Mixers

JS3000 Double-Shaft Forced Concrete Mixer

The JS3000 uses twin-shaft forced mixing for 3,000 L concrete batches in stand-alone or batching-plant installations.

Twin-shaft mixersProject configuration
Request product details ↗← Back to Concrete Mixers
TECHNICAL DATA / TWIN-SHAFT MIXERS

Specifications & configuration

The JS3000 uses twin-shaft forced mixing for 3,000 L concrete batches in stand-alone or batching-plant installations.

Charging volume4,800 L
Discharging volume3,000 L
Reference productivity≤ 150 m³/h
JS3000 Double-Shaft Forced Concrete Mixer — technical specification and equipment configuration
ParameterSpecificationParameterSpecification
Charging volume4,800 LMixing-blade arrangement2 × 10
Discharging volume3,000 LHopper lifting speed26.8 m/min
Reference productivity≤ 150 m³/hTransport dimensions, L × W × H4,943 × 2,850 × 2,500 mm
Mixing mechanismTwin-shaft forced mixingWorking dimensions, L × W × H9,645 × 3,436 × 9,700 mm
Aggregate size, pebble / gravel80 / 60 mmReference machine mass18,000 kg
Mixing-blade speed23 r/minDischarge height3,800 mm
01

Purposeful mixing action

The mixer moves materials through a defined blending pattern to combine aggregate, binder and liquids.

02

Wear-component access

Blades, liners and other working surfaces are the main focus of routine condition checks.

03

Line compatibility

Feeding, water supply and discharge interfaces connect the mixer to the surrounding production equipment.

Operating process

  1. Introduce the measured batch ingredients.
  2. Run the mixer through the specified mixing cycle.
  3. Discharge the mixture to the receiving system.
  4. Clean the mixing chamber and inspect the working surfaces.

Typical applications

  • Concrete batching and production lines
  • Precast and component manufacturing
  • Building and infrastructure works
Discuss this equipment ↗

Published reference configuration. Output depends on the material, operating cycle and site conditions. Final supply follows the agreed technical schedule.

Explore related equipment.

View category ↗
YOUR NEXT PROJECT STARTS HERE

Let’s build
something solid.

Discuss your requirements ↗