ENGINEERING THE FOUNDATIONS OF TOMORROWDiscuss your next project ↗

Concrete Placing Boom

Concrete Placing Boom

Equipment visualization · final configuration follows the technical schedule.

Concrete Pumping Equipment

Concrete Placing Boom

A placing boom connects to a concrete pump and directs the pipeline discharge across the pouring area.

Concrete placingProject configuration
Request product details ↗← Back to Concrete Pumping Equipment
TECHNICAL DATA / CONCRETE PLACING

Specifications & configuration

A placing boom connects to a concrete pump and directs the pipeline discharge across the pouring area.

Equipment functionDistribution of pumped concrete
Pump connectionDelivery pipe from the concrete pump
Boom structureMulti-section articulated placing boom
Concrete Placing Boom — technical specification and equipment configuration
ParameterSpecificationParameterSpecification
Equipment functionDistribution of pumped concreteOperating systemHydraulic boom movement
Pump connectionDelivery pipe from the concrete pumpControl configurationsRemote or control-panel operation
Boom structureMulti-section articulated placing boomInstallation familiesMobile spider and self-climbing arrangements
Folding arrangementsR- or Z-fold configurationsPlacement tasksWalls, columns and elevated concrete work
Published rotation coverage360°System roleFinal concrete distribution after pumping
01

Controlled delivery

The pumping process transfers concrete through a closed pipeline rather than repeated manual handling.

02

Placement connection

Delivery pipes or placing equipment direct the flow to the construction area.

03

Operating coordination

Concrete supply, pumping and final placement are coordinated as one pouring operation.

Operating process

  1. Set up the pump and the delivery-line route.
  2. Supply suitable fresh concrete to the receiving hopper.
  3. Pump and distribute the concrete to the placement area.
  4. Clean the hopper and delivery system after the pour.

Typical applications

  • Building and foundation pours
  • Civil engineering and infrastructure
  • Remote and distributed placement points
Discuss this equipment ↗

Published reference configuration. Output depends on the material, operating cycle and site conditions. Final supply follows the agreed technical schedule.

Explore related equipment.

View category ↗
YOUR NEXT PROJECT STARTS HERE

Let’s build
something solid.

Discuss your requirements ↗