ENGINEERING THE FOUNDATIONS OF TOMORROWDiscuss your next project ↗

JS1500 Twin-Shaft Forced Concrete Mixer

JS1500 Twin-Shaft Forced Concrete Mixer

Equipment visualization · final configuration follows the technical schedule.

Concrete Mixers

JS1500 Twin-Shaft Forced Concrete Mixer

The JS1500 uses twin-shaft forced mixing for 1,500 L concrete batches in stand-alone or batching-plant installations.

Twin-shaft mixersProject configuration
Request product details ↗← Back to Concrete Mixers
TECHNICAL DATA / TWIN-SHAFT MIXERS

Specifications & configuration

The JS1500 uses twin-shaft forced mixing for 1,500 L concrete batches in stand-alone or batching-plant installations.

Charging volume2,400 L
Discharging volume1,500 L
Reference productivity≤ 75 m³/h
JS1500 Twin-Shaft Forced Concrete Mixer — technical specification and equipment configuration
ParameterSpecificationParameterSpecification
Charging volume2,400 LMixing-blade arrangement2 × 8
Discharging volume1,500 LHopper lifting speed23 m/min
Reference productivity≤ 75 m³/hTransport dimensions, L × W × H5,058 × 2,250 × 2,440 mm
Mixing mechanismTwin-shaft forced mixingWorking dimensions, L × W × H9,645 × 3,436 × 9,700 mm
Aggregate size, pebble / gravel80 / 60 mmReference machine mass11,130 kg
Mixing-blade speed25.5 r/minDischarge height3,800 mm
01

Purposeful mixing action

The mixer moves materials through a defined blending pattern to combine aggregate, binder and liquids.

02

Wear-component access

Blades, liners and other working surfaces are the main focus of routine condition checks.

03

Line compatibility

Feeding, water supply and discharge interfaces connect the mixer to the surrounding production equipment.

Operating process

  1. Introduce the measured batch ingredients.
  2. Run the mixer through the specified mixing cycle.
  3. Discharge the mixture to the receiving system.
  4. Clean the mixing chamber and inspect the working surfaces.

Typical applications

  • Concrete batching and production lines
  • Precast and component manufacturing
  • Building and infrastructure works
Discuss this equipment ↗

Published reference configuration. Output depends on the material, operating cycle and site conditions. Final supply follows the agreed technical schedule.

Explore related equipment.

View category ↗
YOUR NEXT PROJECT STARTS HERE

Let’s build
something solid.

Discuss your requirements ↗