01 / PLANNING GUIDE
Start with the site
A fixed production location and a project that moves between sites call for different planning. Consider the available footprint, foundation scope, access routes and expected relocation schedule.
02 / PLANNING GUIDE
Plan material flow
Map aggregate storage, cement delivery, mixer discharge and vehicle circulation. A plant layout should be considered alongside the whole site operation.
03 / PLANNING GUIDE
Define the comparison
Compare configurations using the same materials, production targets and included handling steps. Confirm final technical figures with the supplier.